Code |
Project Title
|
1046 |
complimentary feasibility and advanced first
strage studies of sayad shirazi tunnel from north of sepah sq.to sout of beast highway |
1045 |
Supervision on
Buildings Administration & Maintenance Installations, Sites & Area
of Shahid Bahonar port & Subordinated ports |
1044 |
Preparation of
General Inspection manual of Iran Ports Jetties
|
1043 |
The
presentation of engineering services and supreme supervision on
excavation of Caspian Sea Complex dry dock in Neka |
1042 |
The
presentation of engineering services for designing the foundation of
1000 ton crane of Sadra dry dock in Bushehr |
1041 |
The Studies of
Tiab Port Development |
1040 |
Designing the
Marine Pipelines for Water Intake & Back Water Discharge of Persian
Gulf Setare Oil Refinery |
1039 |
The
presentation of engineering services for excavation and watchman
structure in studies and design of Sadeghie multi discipline complex
|
1038 |
Structure
Design Control of Sadeghie Multi Discipline Complex Project |
1037 |
Preparation of
General Inspection manual of Iran Ports Jetties
|
1036 |
Preparation of
Field Operation Instruction of Iran Marine Geotechnical Projects
|
1035 |
Consultation
Services in Investment Projects of Shahid Rajaee Port Complex
|
1034 |
Investor
Attraction for Collection, Process and Discharge of Floatings Waste
Material |
1033 |
Site
Supervision Services for Construction of four 5970 m3 Tanks, Side
Installation & Supplemental Activities of Oil Warehouse Faze1
|
1032 |
To Control and
Optimize the Steel Structures of South Pars Gas Field development project (phaze
17 & 18) |
1031 |
Design the
second stage port infrastructure (Oil) Persian Gulf |
1030 |
Investigation
to Shahid Rajaee Port Investors Plans |
1029 |
Control and
Coordination with Persian Gulf Investors & Contractors
|
1028 |
Investigation
to Persian Gulf Port Investors |
1027 |
2nd
Sea Water Intake of BandarAbbas Refinery |
1026 |
NIOPDC
Spherical Tanks |
1025 |
6 Iranian
Islands’ Oil Jetties |
1024 |
Mahshahr Oil
Terminal Revamp and Development, Onshore |
1023 |
Shahid
Mahallaty Highway Tunnel |
1022 |
Shahid Sayyade
Shirazi Highway Tunnel |
1021 |
Investment
Counting of Shahid Rajaiee Port Investors |
1020 |
Loan taking
from Islamic Development Bank |
1019 |
Kish Island
Commercial Port |
1018 |
Mobine-2 Sea
Water Intake Environmental Affects |
1017 |
C1 & C5 Oil
Jetties of Shahid Bahonar Port |
1016 |
Preparation of
Technical Documents for Taking the Permit of Floating Construction
and Maintenance Shop |
1015 |
Mobine-2 Sea
Water Intake Environmental Affects |
1014 |
2nd
Voyager Terminal of Kish Commercial Port |
1013 |
Mahshahr Oil
Terminal Revamp and Development, Onshore |
1012 |
Mahshahr Oil
Terminal Revamp and Development, Onshore |
1011 |
Management
Consulting Services Bushehr Port Development Plan
|
1010 |
Persian Gulf Port |
1009 |
Kish Island
Commercial Port, Site Supervision |
1008 |
Kavian
Petrochemical Seawater Intake |
1007 |
Metro Tunnel
Crossing with Shahid Dastjerdi Highway |
1006 |
Neka Port
Existing Basin |
1005 |
South Pars Gas
Field Phase 11 |
1004 |
Mobine-2 Sea
Water Intake, Thermal Diffusion Studies |
1003 |
Consultative
Services in Contract Management |
1002 |
Kish Island
Commercial Port, Master plan studies |
1001 |
Persian Gulf
Port, usage changing studies |